How Ground-Up Construction Loans Work: Draw Schedules Explained

Published
March 2026
Read Time
8 min
Construction site with wood framing underway and a contractor reviewing project financing documents

Why Construction Financing Is Structured Differently

When you buy an existing property, the lender funds the full purchase price at closing because there is a finished asset to collateralize. Ground-up construction loans don’t work this way. Since the collateral is being built from scratch, lenders disburse funds incrementally through a draw schedule — releasing money in stages as construction milestones are completed and verified. Understanding how draws work before you sign is essential to avoiding cash flow problems mid-build.

Construction-Only vs. Construction-to-Permanent

Loan TypeHow It WorksBest For
Construction-OnlyShort-term loan covering build only; replaced by separate permanent financing at certificate of occupancyInvestors planning to sell, or wanting to shop permanent financing separately
Construction-to-PermanentSingle loan that converts to a long-term DSCR or conventional mortgage at certificate of occupancyInvestors building to hold as a rental; one closing and locked exit financing from day one

For investors building to hold, construction-to-DSCR products are increasingly common — they eliminate a second closing and let you lock in permanent financing terms before the build even begins.

Loan-to-Cost vs. Loan-to-ARV: Both Limits Apply

Construction lenders underwrite using two separate metrics, and your loan amount is capped at whichever produces the lower number:

Total project cost (land + build)$600,000
Projected completed value (ARV)$820,000
Max loan at 75% LTC$450,000
Max loan at 70% ARV$574,000
Lender funds lower of the two$450,000

How Draw Schedules Are Structured

A draw schedule ties each disbursement to a specific, verifiable construction milestone. A typical single-family new build uses 5–7 draws:

DrawMilestoneApprox. % of Budget
1Foundation complete and inspected10–15%
2Framing complete15–20%
3Rough mechanical in (HVAC, plumbing, electrical)15–20%
4Insulation, drywall, exterior sheathing complete15–20%
5Interior finishes, cabinets, fixtures installed15–20%
6Final completion, certificate of occupancy issued10–15%
Pricing out financing for your build?
See your terms in minutes · Funding in as little as 48 hours
Check Eligibility

The Draw Request Process, Step by Step

Interest During Construction: You Only Pay on Drawn Funds

Construction loans are interest-only, and you only pay interest on funds already disbursed — not the full loan commitment. This keeps carrying costs low early in the project and increases gradually as more of the budget is drawn.

Total loan commitment$450,000
Drawn to date (mid-build)$210,000
Interest rate10.5%
Monthly interest payment~$1,838

What Lenders Require Before Approving a Construction Loan

Common Draw Mistakes That Stall Projects

Finance Your Ground-Up Build

BrightPath works with investors on ground-up construction financing nationwide. Draw-based funding, fast approvals.

Explore Construction Loan Programs
Related Articles