Ground-Up Construction Calculator

Will this build pencil after the cost of carry?

Plug in your lot, construction budget, and projected ARV. See your max loan (the lower of the LTC and LTARV caps), the equity you’ll need, net profit, and annualized return after points, the interest reserve, holding, and selling costs. No sign-up.

Project details

Enter your numbers — results update as you type.
Lot purchase price land cost
$
Construction budget full build cost
$
After-Repair Value (ARV) completed value
$
Financing caps
Max LTC % of total cost
%
Max LTARV % of ARV
%
Loan terms
Interest rate annual rate
%
Loan points % of loan upfront
%
Timeline & carrying costs
Construction term months to CofO
mo
Monthly holding costs tax, ins, utilities
$
Closing & selling
Closing costs (acquisition) % of project cost
%
Selling costs % of sale price
%
Estimated net profit
$68,750
Strong margin — healthy build
ROI on cash
67.2%
Profit / cash invested
Annualized return
67.2%
Adjusted for build time
Equity to close
$102,250
Out of pocket

Max loan = lower of two caps

LTC limit (90% of cost)$450,000
LTARV limit (75% of ARV)$506,250
Max loan (lower of the two)$450,000
This deal is LTC-constrained — your cost basis sets the ceiling. Equity needed: $50,000.

How we got there

After-Repair Value (sale price)$675,000
Selling costs (8%)−$54,000
Net sale proceeds$621,000
Lot purchase$100,000
Construction budget$400,000
Interest reserve (50% avg balance)$24,750
Loan points$9,000
Closing costs (acquisition)$12,500
Holding costs$6,000
Total project cost$552,250
Net profit = Sale − Costs$68,750

Build pencils? Check eligibility before you break ground.

Ground-up deals hinge on getting draws funded on time. Submit one short scenario and your project numbers pre-fill the form — then compare construction financing options from lenders in our network. Checking your options won’t affect your credit score.

Check eligibility on this build
Takes about 30 seconds
Reading the numbers

What's a "good" ground-up build?

Ground-up construction ties up capital for a long time — typically 12 to 30 months from lot close to certificate of occupancy — so experienced builders target a 20%+ ROI and meaningful absolute profit to compensate for the duration and execution risk. A build that pencils at 10% on paper rarely survives a permit delay, a subcontractor walking off, or a 10% materials overrun.

The loan is sized as the lower of two caps: a percentage of total cost (LTC, lot + construction budget) and a percentage of the completed appraised value (LTARV). Knowing which cap binds your deal tells you where the risk sits — an LTARV-constrained deal is betting on a finished value you haven't proven yet, while an LTC-constrained deal just needs you to control costs.

Profit benchmarks

Strong
25%+ ROI
Healthy margin for a long build. Absorbs overruns and timeline slippage and still profits.
Acceptable
15–25%
Standard spec-build deal. Pencils if you control the GC and the schedule tightly.
Marginal
8–15%
Thin for a 12–30 month hold. One major delay or cost overrun erases it. Proceed only with edge.
Don't do it
<8%
The duration risk isn't worth the return. The capital is better deployed elsewhere.

Levers that change the math

For the full breakdown of how ground-up financing works — LTC vs LTARV, draw schedules, interest reserves, builder experience requirements, and the construction-to-DSCR refinance exit — see our complete ground-up construction loans guide, or model your financing on the ground-up loan page.