Plug in your lot, construction budget, and projected ARV. See your max loan (the lower of the LTC and LTARV caps), the equity you’ll need, net profit, and annualized return after points, the interest reserve, holding, and selling costs. No sign-up.
Ground-up deals hinge on getting draws funded on time. Submit one short scenario and your project numbers pre-fill the form — then compare construction financing options from lenders in our network. Checking your options won’t affect your credit score.
Check eligibility on this buildGround-up construction ties up capital for a long time — typically 12 to 30 months from lot close to certificate of occupancy — so experienced builders target a 20%+ ROI and meaningful absolute profit to compensate for the duration and execution risk. A build that pencils at 10% on paper rarely survives a permit delay, a subcontractor walking off, or a 10% materials overrun.
The loan is sized as the lower of two caps: a percentage of total cost (LTC, lot + construction budget) and a percentage of the completed appraised value (LTARV). Knowing which cap binds your deal tells you where the risk sits — an LTARV-constrained deal is betting on a finished value you haven't proven yet, while an LTC-constrained deal just needs you to control costs.
For the full breakdown of how ground-up financing works — LTC vs LTARV, draw schedules, interest reserves, builder experience requirements, and the construction-to-DSCR refinance exit — see our complete ground-up construction loans guide, or model your financing on the ground-up loan page.